Projects
Webhook — Add Task

Loading…

Admin Login
Edit Task
Add Block
+ Add
Inbox
Overdue 47
Past due
Enable maintenance mode / disable checkout on live site
Todo Medium 03 May
Spin up new DO droplet, add to Ploi
Todo Medium 03 May
Clone site via Ploi to staging.dusun.com.my
Todo Medium 03 May
Lower TTL on staging.dusun.com.my DNS, add A record → new droplet IP
Todo Medium 03 May
Issue SSL for staging via Ploi
Todo Medium 03 May
Run search-replace: dusun.com.my → staging.dusun.com.my
Todo Medium 03 May
Switch PHP from 7.4 → 8.2 on new server via Ploi
Todo Medium 03 May
Test staging thoroughly (shop, cart, checkout, admin, logs)
Todo Medium 03 May
Fix any incompatibilities
Todo Medium 03 May
Run reverse search-replace: staging.dusun.com.my → dusun.com.my
Todo Medium 03 May
Verify siteurl and home in wp_options
Todo Medium 03 May
Change primary domain in Ploi to dusun.com.my, reissue SSL
Todo Medium 03 May
Flip DNS A record for dusun.com.my → new droplet IP
Todo Medium 03 May
Confirm live site, disable maintenance mode
Todo Medium 03 May
Destroy old Bionic droplet
Todo Medium 03 May
Plan evaluation structure: Slow Loading + Bot Traffic
Todo Medium 04 May
Provision CX22 and BX11 from Hetzner console
Todo Medium 04 May
Add CX22 to Ploi, provision server (PHP, Nginx, MySQL)
Todo Medium 04 May
Point test subdomain DNS to CX22 IP
Todo Medium 04 May
Create a test WordPress site on Ploi using the subdomain
Todo Medium 04 May
Create BX11 mount point on CX22: sudo mkdir -p /mnt/bx11
Todo Medium 04 May
Add rclone aliases to ~/.bashrc on CX22:
Todo Medium 04 May
Configure rclone BX11 remote (SFTP, port 23)
Todo Medium 04 May
Test mount: bx11-on, browse, bx11-off
Todo Medium 04 May
Configure Ploi DB backup → BX11 via SFTP, run manual backup, verify file lands on BX11
Todo Medium 04 May
Stylesheet scripts (CSS) are missing at times, causing layout misalignments
Todo Medium 04 May
Identify custom post types and sections that requires frequent updates and separation from Elementor layouts
Todo Medium 04 May
Identify areas that requires improvement (site audit)
Todo Medium 04 May
On Vultr: run fresh full UpdraftPlus backup → Dropbox (existing setup)
Todo Medium 05 May
On CX22: create the WC site in Ploi using the live domain
Todo Medium 05 May
Install WordPress + UpdraftPlus Premium on new site
Todo Medium 05 May
Connect same Dropbox account in UpdraftPlus, restore from backup
Todo Medium 05 May
Post-restore checks
Todo Medium 05 May
Put old site in maintenance mode
Todo Medium 05 May
Switch DNS A record to CX22 IP, wait for propagation
Todo Medium 05 May
Confirm SSL in Ploi, verify live site
Todo Medium 05 May
Reconfigure UpdraftPlus destination from Dropbox → BX11 SFTP
Todo Medium 05 May
Reconfigure Ploi backup destination from Dropbox → BX11 SFTP
Todo Medium 05 May
Run test backup from both, verify files land on BX11
Todo Medium 05 May
Decommission Vultr instance
Todo Medium 05 May
On CX22: configure rclone Dropbox remote (OAuth via browser on Mac)
Todo Medium 06 May
Test connection: rclone lsd dropbox:
Todo Medium 06 May
Start transfer in tmux
Todo Medium 06 May
Detach with Ctrl+B D, let it run overnight
Todo Medium 06 May
After completion, verify:
Todo Medium 06 May
Spot-check folders via rclone mount
Todo Medium 06 May
Cancel Dropbox Plus before next renewal (15 June 2026)
Todo Medium 06 May
Unassigned 28
No block
Implement a retroactive data collection method
Todo Critical 20 Apr
Card Payments
In Progress Critical 04 May
Send invoice to MatnBeyond
Todo High 05 May
Server update + reboot
Todo Medium
Please change limit to all instudio classes to 30
Todo Medium 21 Apr
Yes, can you give us the quote for the pop up box (we can have it popping up for 1 month, then take it out later)
Todo Medium 21 Apr
Patrick Can please check. Uma’s 72 credits from be pack are there but no idea what’s the issue. I’ve added Uma to the attendance and click resend link. Can you please check and deduct 8 credits for the 7pm class. Thanks.
Todo Medium 21 Apr
Let me reach out to the support for more information on DuitNow OBW refund period :pray:
Todo Medium 22 Apr
Hi marella +639178774749 I shall update my quotation to USD for better clarity :pray:
Todo Medium 22 Apr
Noted, I will proceed to broadcast it later this evening :pray:
Todo Medium 22 Apr
↷ Forwarded I’m trying to sign up and place an order, but I keep getting a “Please complete the reCAPTCHA” message even though the reCAPTCHA is not showing on my screen. Could you please advise how to fix this issue?
Todo Medium 22 Apr
Patrick Can you please refund Jean one Gita talk since tonight’s talk has been cancelled. Thanks.
Todo Medium 22 Apr
Patrick please send it to all who signed up for zoom and in studio for Sunday’s special class @830am via email. Thanks.
Todo Medium 23 Apr
Good morning Patrick, Can you please check how many sessions is left in Ms Choon May (pet Milo) package?? Thank you
Todo Medium 24 Apr
hi Patrick, I just checked the website, seems the booking availability for next week has not been programmed?
Todo Medium 26 Apr
Please cancel gita talks until may 13
Todo Medium 26 Apr
Stratoscope Publication - Q1 2026 Edition
Todo Medium 27 Apr
Patrick Kamal hasn’t received the email with link as yet although I had already completed his order. Please assist.
Todo Medium 27 Apr
Patrick I forgot to tell uou to cancel Lina’s class on the 30th April. 8.30pm She is not around. Please Tq
Todo Medium 27 Apr
Morning Patrick FYI Chii Ye didn’t get the email with link although she had booked. I had sent her the link via WhatsApp. Her email address is ChiiYe_<http://ziyu@iCloud.com|ziyu@iCloud.com>
Todo Medium 28 Apr
↷ Forwarded Hi, online password reset got problem, can you please assist ?
Todo Medium 28 Apr
Good afternoon Patrick, Can you please help check if this transaction went through?? :pray::pray:
Todo Medium 29 Apr
Customer can pay thru
Todo Medium 29 Apr
↷ Forwarded Hi, din’t receive link, and I try reset myself also , after 10 mnts din’t receive it
Todo Medium 29 Apr
Move non-critical emails to Brevo
Todo Medium 04 May
Hi Patrick, The studio is close on the 9th &amp; 10th, 11th &amp; 12th, can you Please cancel all the classes scheduled on this day. Also can you add 6 days to puteri syaza package. And 4 days to the rest of the clients who purchased unlimited packages. Thank you.
Todo Medium 04 May
↷ Forwarded hi dusun, not urgent… but i wanted to order a watermelon cake for pickup. the website option is for delivery only. is there a pickup option?
Todo Medium 04 May
need your help to open the landing page for school open day
Todo Medium 04 May